{"product_id":"power-grid-quebec-baden-wurttemburg-special-order","title":"POWER GRID: QUEBEC \u0026 BADEN-WURTTEMBURG (Special Order)","description":"\u003cp\u003e\u003cstrong\u003e⚠️ Special order — final sale:\u003c\/strong\u003e we order this specifically for you from our distributor, so it \u003cstrong\u003ecannot be cancelled or refunded\u003c\/strong\u003e and ships a bit later than an in-stock item. If \u003cstrong\u003ePoké Jeux\u003c\/strong\u003e is unable to fulfill it (e.g. distributor allocation), you are refunded \u003cstrong\u003ein full — no fee\u003c\/strong\u003e.\u003c\/p\u003e\u003cp lang=\"fr\"\u003e\u003cstrong\u003e⚠️ Commande spéciale — vente finale :\u003c\/strong\u003e nous commandons cet article spécifiquement pour vous chez notre distributeur ; il \u003cstrong\u003ene peut être annulé ni remboursé\u003c\/strong\u003e et est expédié un peu plus tard qu'un article en stock. Si \u003cstrong\u003ePoké Jeux\u003c\/strong\u003e ne peut l'honorer (ex. allocation du distributeur), vous êtes remboursé \u003cstrong\u003een totalité — sans frais\u003c\/strong\u003e.\u003c\/p\u003e\u003cp\u003eDesigner: Friedemann Friese\u003cbr\u003eArtist: Lars-Arne \"Maura\" Kalusky\u003cbr\u003eYear Published: 2012\u003cbr\u003e# of Players: 2 − 6\u003cbr\u003ePlaying Time: 120 minutes\u003cbr\u003eAges: 12 and up\u003c\/p\u003e\u003cp\u003eThe two maps included in Power Grid: Québec \u0026amp; Baden-Württemberg were previously released in two separate Power Grid base games: Québec is part of Mégawatts, the French edition of the game released by Filosofia, while Baden-Württemberg was included in Funkenschlag: EnBW, a German edition of the game from EnBW.\u003c\/p\u003e\u003cp\u003eIn Québec, the Canadian province Québec places great emphasis on energy production via ecological hydro power plants. Once an ecological power plant has been added to the power plant market, it will remain until purchased by a player or removed when the number on it is lower than the number of cities power by any player. The two cities of Montreal and Québec City offer several cheap connections, making this map challenging with several layers of decisions for building the best networks.\u003c\/p\u003e\u003cp\u003eIn Baden-Württemberg, the clocks move differently: The main change focuses on the order of phases of a game round. First, you buy power plants, then you rearrange the player order. Furthermore, as this province is small, several transregional locations may be connected only starting in step 2«.\u003c\/p\u003e\u003cp\u003eOnly a single printing of Power Grid: Québec \u0026amp; Baden-Württemberg will be produced, although the Québec map will remain available in Mégawatts.\u003c\/p\u003e\u003cp\u003eIncorporates maps from:\u003c\/p\u003e\u003cp\u003e• Mégawatts\u003cbr\u003e• Funkenschlag: EnBW\u003c\/p\u003e","brand":"RIO GRANDE","offers":[{"title":"Default Title","offer_id":48324894458009,"sku":"655132004794","price":17.99,"currency_code":"CAD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0621\/1669\/2121\/files\/raw_73c58cd6-b6ec-4fad-9a65-69803816b691.jpg?v=1784314175","url":"https:\/\/www.pokejeux.ca\/fr\/products\/power-grid-quebec-baden-wurttemburg-special-order","provider":"POKÉ JEUX","version":"1.0","type":"link"}