⚠️ Special order — final sale: we order this specifically for you from our distributor, so it cannot be cancelled or refunded and ships a bit later than an in-stock item. If Poké Jeux is unable to fulfill it (e.g. distributor allocation), you are refunded in full — no fee.
⚠️ Commande spéciale — vente finale : nous commandons cet article spécifiquement pour vous chez notre distributeur ; il ne peut être annulé ni remboursé et est expédié un peu plus tard qu'un article en stock. Si Poké Jeux ne peut l'honorer (ex. allocation du distributeur), vous êtes remboursé en totalité — sans frais.
Designer: Friedemann Friese
Artist: Lars-Arne "Maura" Kalusky
Year Published: 2012
# of Players: 2 − 6
Playing Time: 120 minutes
Ages: 12 and up
The two maps included in Power Grid: Québec & Baden-Württemberg were previously released in two separate Power Grid base games: Québec is part of Mégawatts, the French edition of the game released by Filosofia, while Baden-Württemberg was included in Funkenschlag: EnBW, a German edition of the game from EnBW.
In Québec, the Canadian province Québec places great emphasis on energy production via ecological hydro power plants. Once an ecological power plant has been added to the power plant market, it will remain until purchased by a player or removed when the number on it is lower than the number of cities power by any player. The two cities of Montreal and Québec City offer several cheap connections, making this map challenging with several layers of decisions for building the best networks.
In Baden-Württemberg, the clocks move differently: The main change focuses on the order of phases of a game round. First, you buy power plants, then you rearrange the player order. Furthermore, as this province is small, several transregional locations may be connected only starting in step 2«.
Only a single printing of Power Grid: Québec & Baden-Württemberg will be produced, although the Québec map will remain available in Mégawatts.
Incorporates maps from:
• Mégawatts
• Funkenschlag: EnBW